Send Message
MOORE AUTOMATION LIMITED
Email miya@mvme.cn TEL: 86-180-20776792
Home > products > Automation DCS >
LS-430990/0 ALSTOM One Year Warranty PLC Module
  • LS-430990/0  ALSTOM  One Year Warranty PLC Module
  • LS-430990/0  ALSTOM  One Year Warranty PLC Module

LS-430990/0 ALSTOM One Year Warranty PLC Module

Place of Origin USA
Brand Name ALSTOM
Certification CO.CQ
Model Number LS-430990/0
Product Details
Description:
ALSTOM
Type:
LS-430990/0
Lead Time:
In Stock
Condition:
New100%
Manufacture Year:
2020
Shipping By:
DHL/UPS/EMS/FEDEX/TNT Or Agent Etc
Application:
Nuclear Power Plant
Weight:
4lbs
High Light: 

LS-430990/0

,

One Year Warranty PLC Module

,

ALSTOM LS-430990/0

Payment & Shipping Terms
Minimum Order Quantity
1
Price
inquiry
Packaging Details
new and original with factory sealed
Delivery Time
today
Payment Terms
T/T
Supply Ability
10 pieces a day
Product Description

 

LS-430990/0 ALSTOM One Year Warranty PLC Modulety

 

⇒ Click here for good price ALSTOM

Brand/Manufacturer   ALSTOM/USA
Part Number

  LS-430990/0

Alternate Part Number   LS-430990/0
Description   PLC MODULE
Dimennsions

  30x10x38cm 

Weight   1.25kg

 

Moore News

NONFERROUS INDUSTRY

Non-ferrous Industry Capability

 

The sintering method and the Bayer process are currently the main methods for industrial production of alumina.

Most of the alumina produced is produced by Bayer process.

The Bayer-sintering hybrid method was first created, which greatly improved the total recovery of alumina.

With the continuous improvement of production technology, some new production methods such as lime Bayer method and beneficiation Bayer method are continuously applied to production.

 

The integrated process control system is a distributed control system.

The system consists of eight process control subsystems (workshop) for raw material grinding, lime digestion, dissolution, sedimentation, seed filtration, evaporation, product filtration, and roasting.

Each workshop has an engineering station EWS and 2-3 operator stations OPS.

The data collection, real-time monitoring, data processing and other information transmission of the internal process parameters of the workshop are realized by the EtherNet/IP control network.

The main production operations of the entire alumina plant are completed by these eight subsystems, each controlled by a ControlLogix controller.

 

The information layer of the integrated process control system uses EtherNet/IP Industrial Ethernet.

Transfer the information of the above eight workshops to the whole plant production information dispatching center via Ethernet.

The center has two servers SERVER1, SERVER2 and two operating stations OPS1, OPS2, using the factory machine SE Factory.

Centralized monitoring, control and management of the entire plant production process.

 

Contact Us

Email: miya@mvme.cn (CLICK)

QQ: 2851195450

Tel: 86-18020776792(CLICK)

Skype:miyazheng520(CLICK)

 

More Products 

 

B&R 8V1090.00-2 B&R 4PP220.0571-45
B&R 3IF260.60-1 B&R X20IF1061-1
B&R 3IF672.9 B&R 3D04806
B&R 3CP260.60-1 B&R 8V1045.00-2
B&R 4C1300.01-510 B&R 3DM455.60-2
B&R 4PP065.0571-X74 B&R 3AI775.6
B&R 4D1165.00-590 B&R 3DO486.6
B&R ECCP70-01+ECFP128-0 B&R 3PS465.9
B&R ECPA42-01 B&R 3CP340.60-2
B&R 3IF772.9 B&R X20AT4222


Our advantages

1)TRICONEX(3008,3625,3805E.3721,3700A 4351B...)
2) BENTLY NEVADA(3500/42M ,3500/22M,3500/95.3500/05...)
3) HIMA(F3330,F3236 ,F6217,F7126,F8621A....)
4) FOXBORO(FBM203,FBM204,FBM217,FMB231...)
5) Allan-Bradley (1756,1785,1771,1746,1769..)
6) ABB (DSQC .....)
7) GE(IC693,IC697,IC695,IS200,DS200)
8) BACHMANN(CM202,DI232,MPC240,NT255,AIO288...)
9) ICS (T8403,T8431...

LS-430990/0  ALSTOM  One Year Warranty PLC Module 0

Contact Us at Any Time

86-180-20776792
32D floor ,GuoMao building , Hubin South Road, Siming District,Xiamen City,Fujian Province,China.
Send your inquiry directly to us