logo
Home > products >
Automation DCS
>
AE-R08-1.03 + AE-EC2-1.01 AMK One Year Warranty PLC Module

AE-R08-1.03 + AE-EC2-1.01 AMK One Year Warranty PLC Module

Product Details:
Place of Origin: USA
Brand Name: AMK
Certification: CO.CQ
Model Number: AE-R08-1.03 + AE-EC2-1.01
Detail Information
Place of Origin:
USA
Brand Name:
AMK
Certification:
CO.CQ
Model Number:
AE-R08-1.03 + AE-EC2-1.01
Manufacture Year:
AMK
Con 6DS1311-8AEtrol System:
AE-R08-1.03 + AE-EC2-1.01
Application:
Nuclear Power Plant
Lead Time:
In Stock
Description:
2020
Weight:
4lbs
Trading Information
Minimum Order Quantity:
1
Price:
inquiry
Packaging Details:
new and original with factory sealed
Delivery Time:
today
Payment Terms:
T/T
Supply Ability:
10 pieces a day
Product Description

 

AE-R08-1.03 + AE-EC2-1.01 AMK One Year Warranty PLC Module

 

⇒ Click here for good price AE-R08-1.03 + AE-EC2-1.01

Brand/Manufacturer   AMK/USA 
Part Number

  AE-R08-1.03 + AE-EC2-1.01

Alternate Part Number   AE-R08-1.03 + AE-EC2-1.01
Description   PLC Module
Dimennsions

  38x36x5cm 

Weight   1.32kg

 

Contact Us

Email: miya@mvme.cn (CLICK)

QQ: 2851195450

Tel: 86-18020776792(CLICK)

Skype:miyazheng520(CLICK)

 

MOORE NEWS 

Non-ferrous Industry Capability

 

The sintering method and the Bayer process are currently the main methods for industrial production of alumina.

Most of the alumina produced is produced by Bayer process.

The Bayer-sintering hybrid method was first created, which greatly improved the total recovery of alumina.

With the continuous improvement of production technology, some new production methods such as lime Bayer method and

beneficiation Bayer method are continuously applied to production.

 

The integrated process control system is a distributed control system.

The system consists of eight process control subsystems (workshop) for raw material grinding, lime digestion, dissolution,

sedimentation, seed filtration, evaporation, product filtration, and roasting.

Each workshop has an engineering station EWS and 2-3 operator stations OPS.

The data collection, real-time monitoring, data processing and other information transmission of the internal process parameters

of the workshop are realized by the EtherNet/IP control network.

The main production operations of the entire alumina plant are completed by these eight subsystems, each controlled by a ControlLogix controller.

 

The information layer of the integrated process control system uses EtherNet/IP Industrial Ethernet.

Transfer the information of the above eight workshops to the whole plant production information dispatching center via Ethernet.

The center has two servers SERVER1, SERVER2 and two operating stations OPS1, OPS2, using the factory machine SE Factory.

Centralized monitoring, control and management of the entire plant production process.

 

 

Our advantages

1) TRICONEX(3008,3625,3805E.3721,3700A 4351B...)
2) BENTLY NEVADA(3500/42M ,3500/22M,3500/95.3500/05...)
3) HIMA(F3330,F3236 ,F6217,F7126,F8621A....)
4) FOXBORO(FBM203,FBM204,FBM217,FMB231...)
5) Allan-Bradley (1756,1785,1771,1746,1769..)
6) ABB (DSQC .....)
7) GE(IC693,IC697,IC695,IS200,DS200)
8) BACHMANN(CM202,DI232,MPC240,NT255,AIO288...)
9) ICS (T8403,T8431...)

 

More Products 

AB 1756-IRT8I AB 1756-IF4FXOF2F
AB 1756-PA75R AB 1756-PSCA2
AB 2711-M3A18L1 AB 1756-PH75
AB 1746-N2 AB 2711-K5A8
AB 1746-OBP8 AB 1756-CFM
AB 1756-PB75R AB 1764-LSP
AB 1746-HSCE2 AB 1784-SD1
AB 1764-MM1RTC AB 1783-ETAP
AB 1746-OB32E AB 1794-IB16D
AB 2711-K3A10L1 AB 1794-TB3S


AE-R08-1.03 + AE-EC2-1.01  AMK   One Year Warranty PLC Module 0